From First Call to Fitted Cabinets

We keep the workflow transparent so you know what happens after you send an enquiry. Each stage has a clear deliverable, and you stay involved at the points that matter.

Layout Consultation

We start with your floor plan and a short call about how you cook, store, and move through the room. From that we draft a 3D layout with cabinet runs, clearances, and appliance zones before any material is cut.

Material and Hardware Selection

You choose between plywood, MDF, or solid wood for the carcass and doors. We also lock down hinges, runners, and organizers at this stage, because drawer depth and door weight change how the unit is machined.

CNC Cutting and Edge Banding

Panels are cut on our CNC router with the exact dimensions from the approved layout. Every exposed edge gets banded before assembly, so the finish stays clean even on cutouts for sinks and hob units.

Dry Assembly and Fit Check

We assemble each cabinet in the workshop first. Doors are hung, drawers are run, and gaps are checked against the plan. This is where we catch alignment issues while adjustments are still cheap.

On-Site Installation

Our crew delivers the units and fits them in your space. We level the cabinets, fix them to the wall, and adjust the hardware so everything opens and closes as it should. We also handle trim pieces and plinth details.

Handover and Care Notes

You get a walkthrough of the installed cabinetry, including how to adjust soft-close mechanisms and which cleaning products are safe for the finish. If something needs a tweak after a few weeks, we come back and sort it.

Workflow at XCA Cabinetry

From First Sketch to Final Fixing

A clear sequence of steps so you know what happens after you call, what we need from you, and where the timeline can stretch.

Site Measure and Layout Plan

We visit your kitchen or wardrobe space, take wall-to-wall measurements, and note plumbing, electrical points, and window positions. Within a few days you get a 3D layout sketch with cabinet runs, door swings, and clearance gaps marked.

Material and Hardware Selection

You choose between plywood, MDF, or solid wood for carcasses and doors. We walk through edge banding options, soft-close hinges, pull-out runners, and finish samples so the quote matches the actual build, not a generic estimate.

CNC Cutting and Edge Banding

Once the layout is approved, panels are cut on our CNC router with precision dados and dowel holes. Edges are banded in the same session, and hardware holes are drilled before assembly so nothing is adjusted on site.

Workshop Assembly and Dry Fit

Carcasses are assembled in our workshop first. Doors and drawers are hung, aligned, and tested for smooth travel. This dry fit catches most fitting issues before the units leave the floor, saving time during installation.

On-Site Installation and Adjustment

Our crew installs the units, levels them against your floor and walls, and fixes any gaps with filler strips. Soft-close mechanisms are tuned, and we check every drawer and door for consistent clearance before we hand over the space.

Handover and Care Notes

You get a short walkthrough of how the hardware works, what to avoid when cleaning, and which surfaces need periodic care. If anything shifts after a few weeks of use, we come back to adjust hinges and runners at no extra charge.

From First Sketch to Final Fixing

A clear timeline of how a cabinet project moves through our workshop, from the initial site measure to the day the doors close properly.

Week 1 - Site Measure and Brief

We visit your space, take accurate dimensions, and note the things that matter: wall flatness, ceiling height, pipe runs, and how you actually use the kitchen. This is where the layout starts, not in a showroom.

Week 2 - 3D Layout and Material Plan

You receive a 3D layout with every door, drawer, and shelf drawn to scale. We also confirm the material schedule - plywood grades, MDF for painted panels, or solid wood where you need visible grain - before any cutting begins.

Week 3 - CNC Cutting and Edge Banding

Panels are cut on the CNC bed with a nesting plan that keeps waste low and grain direction consistent. Edges are banded the same day so the core stays sealed, especially around sinks and dishwashers.

Week 4 - Hardware Fitting and Assembly

Soft-close hinges, pull-out runners, and internal organizers are fitted and adjusted. Drawers are cycled, doors are aligned, and every moving part is checked for smooth travel before the unit leaves the shop.

Week 5 - On-Site Installation and Handover

We install the carcasses, level them against the floor and walls, then hang doors and set the final clearances. You get a walkthrough of each cabinet, plus care notes for the finishes and hardware.

After Handover - Adjustments and Support

Settling happens in the first few weeks. We return once to re-tension hinges, re-check drawer alignment, and address anything that shifted during daily use. After that, the units are yours to live with.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.